1. Mound of Gypsum prior to capping.
2. RAWMAT® composite system feeds into collection drain around cap.
3. RAWMAT® HDB laid onto 27m long slope at 1:4 angle.
4. Rawdrain and Rawgrid applied before cover material placed over composite.
5. Compaction of covering layer.