Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_01.jpeg
1. Bund walls are prepared with TR 35 fillet and Rawpaste mastic prior to laying membrane.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_02.jpeg
2. Overlaps are sealed with an application of Rawpaste mastic.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_03.jpeg
3. All internal and external corners are sealed to ensure a complete seal is achieved.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_04.jpeg
4. The entire bund must be sealed ensuring a bond is made to all plinths, sumps and ducts.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_05.jpeg
5. Once the membrane is laid and all overlaps/penetrations sealed, 50mm sand identification layer is placed.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_06.jpeg
6. A minimum 200mm layer of single sized stone is placed into the bund.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_07.jpeg
7. The stone confines the RAWMAT® HDB but allows volume for oil to be maintained.
-
Transformer Bunds
../media/content/environmental_protection_product_applications/transformer_bunds/slideshow_large/Transformer_08.jpeg
8. RAWMAT® HDB provides an economical and effective barrier to transformer bunds. Also allows easy maintanence.