Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_7.jpeg
1. Infill and compaction of the ring beam beneath the tank.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_8.jpeg
2. RAWMAT® HDB laid onto compacted infill 300mm below ring beam.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_5.jpeg
3. Compacting 300mm deep confining material above RAWMAT® HDB across tank base.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_9.jpeg
4. Bit sand layer placed prior to application of tank base plate.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_10.jpeg
5. Once tank constructed bund floor can be lined with RAWMAT® HDB.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_2.jpeg
6. RAWMAT® HDB fixed to bund wall and covers the floor of the bund.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_3.jpeg
7. RAWMAT® HDB sheets overlapped across area of bund floor.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_11.jpeg
8. RAWMAT® HDB sheets fixed to pipe support stanchions with nails & termination bars.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_13.jpeg
9. The membrane is covered with 300mm confining material.
-
Concrete Walled Bunds
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_14.jpeg
10. Completed bund lined and operational.
-
Example Installation
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_15.jpeg
1. Rolls of RAWMAT® HDB Type P laid onto contaminated prepared formation and overlapped to form impermeable barrier.
-
Example Installation
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_16.jpeg
2. Once RAWMAT® HDB laid, Rawdrain 444 drainage composite installed above Rawmat as protection and to promote free drainage of bund floor.
-
Example Installation
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_17.jpeg
3. RAWMAT® HDB and Rawdrain covered with 250mm layer of contaminated material previously stockpiled within bund.
-
Example Installation
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_18.jpeg
4. Rawtex separation geotextile placed over contaminated fill to retain 50mm clean stone layer across bund floor.
-
Example Installation
../media/content/petrochemical_lining_product_applications/concrete_bunding/slideshow_large/Concrete_19.jpeg
5. Completed bund upgrade meets statutory regulations utilising contaminated ground from original bund floor. Costs minimised as no contaminated is needed to be sent to landfill.