Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_22.jpeg
1. The earth walls and bund floor can be re-lined using the RAWMAT® HDB system without the need for costly removal of contaminated materials off-site.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_23.jpeg
2. Trim to provide a smooth, void-free surface onto which the RAWMAT® HDB can be laid. Excavate a 500mm x 500mm anchor trench at the top of the dyke. Run 2000mm onto floor of bund.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_15.jpeg
3. RAWMAT® HDB secured into anchor trench at the top of the berm.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_16.jpeg
4. Rawgrid placed over RAWMAT® HDB for additional slope stability.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_20.jpeg
5. Rolls of RAWMAT® HDB rolled across the prepared formation of stripped clay, as installation progresses across the bund floor the next area of stripped clay is placed over the RAWMAT® HDB.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_17.jpeg
6. RAWMAT® HDB and Rawgrid backfilled and thoroughly compacted.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_2.jpeg
7. RAWMAT® HDB continues to be laid to the prepared berm and bund floor.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_3.jpeg
8. RAWMAT® HDB fixed to pipe support through termination bar.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_4.jpeg
9. Overlaps in RAWMAT® HDB sealed with Rawpaste Mastic.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_18.jpeg
10. Compacting 300mm cover layer over the RAWMAT® HDB membrane.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_19.jpeg
11. Completed bund after re-lining with RAWMAT® HDB.
-
Earthen Walled Bunds
../media/content/petrochemical_lining_product_applications/earthen_bunding/slideshow_large/Earthen_21.jpeg
12. Completed bund with vegetation re-established on berms of bund and gravel layer placed over clay confining material.