Section Navigation

Product Applications

Fuel Security: True hydrocarbon resistance without periodic re-flooding of the bund.

A series of photographs showing various stages through the construction process, each show the preparation and installation of the RAWMAT® HDB membranes and RAWSEAL® waterstops. The quality of these images is subject to variation and reflects on-going developments in photographic technology spanning almost two decades, as well as on-site lighting levels and other restrictions.

Product application image

Concrete Walled Bunds

Infill and compaction of ring-beam; placement and overlapping of membrane; confinement and affixation to pipe support stanchions.

Product application image

Earthen Walled Bunds

Preparation of formation; backfilling & compaction and pipe supports.

Product application image

Earth-Based Tanks

Preparation of formation; laying; overlapping; sealing to Tell-Tales and compaction.

Product application image

Jacked Tanks

Preparation of formation; laying; overlapping; sealing to Tell-Tales and compaction.

Product application image

Concrete Ring Beams

In-fill; bedding of waterstop; laying; sealing to Tell-Tales and backfill placement.

Product application image

Replacing Tank Floors

Mastic & waterstop application; sealing to Tell-Tales; overlapping and concrete pour.

Login Status

You are not currently logged-in. Please Register & Log-in to download documentation.