A series of photographs showing various stages through the construction process, each show the preparation and installation of the RAWMAT® HDB membranes and RAWSEAL® waterstops. The quality of these images is subject to variation and reflects on-going developments in photographic technology spanning almost two decades, as well as on-site lighting levels and other restrictions.
A selection of completed Structural Waterproofing projects from around the world.
Laying onto blinding concrete; slab shutters; staggered joints; laying onto a compacted sub-base; sandy sub-bases covered in concrete and gas collection substrates.
Pouring concrete over roof membrane; protective concrete blinding; protective concrete screeding and sealing to diaphragm walls.
Secant piles; deep basement construction; sheet piles; floor slabs; property line application; sacrificial shutters; fixing to rock face; mass concrete party wall and rebar placement.
Fixing vertically; slab to wall junctions; fixing of terminations at ground level and protection/insulation boards.
Placement of backfilling; compaction of backfilling; fixing with termination bars and granular backfilling.
Replacing puddle-flanged pipes; sealing to penetrations; pre-cast piles; sealing collars to pipes; sealing to ducting; sealing to ground anchors and sealing to vent penetrations.
Floor slabs; rebates; kickers; floor construction joints; vertical construction joints and slab construction joints.